top of page

Britannia Youth Centre

The works comprise of the remodelling of the existing building space on the ground, to provide accommodation for a gym, media suite, classroom and social area.

Roofing repairs and improvements to the thermal performance-replace broken roof tiles, the installation of Kingspans Insulated board to the underside of the roof soffits.

General refurbishment of wall and ceiling finishes- decorations to all previously painted surfaces, emulsion and gloss painting.

New kitchen and boiler to the main building- supply and install a new Howdens Kitchen and Survey area.
New windows to upper floors- supply and install new UOVC windows replace defective or boarded over windows. New flooring- supply and lay new sheet vinyl and floor tiles to office and common parts.

Improvements to accessible toilet facilities- Reconfigure existing disabled WC and form a new accessible entrance.
Repairs to existing lift- employ a speciality lift engineer to overhaul and leave running the existing passenger lift. Alteration to existing heating installation- alterations to existing plumbing and heating supplies to reconfigured WC and heating facilities.

bottom of page